LA Permits

Start with the address.

A Los Angeles mailing address does not always tell you which local agency reviews the project. Identify the jurisdiction before using a plan or a permit checklist.

Before submittal

Check that the drawings describe the same job.

Set the site plan and floor plan side by side. Compare the entry, existing buildings, and any areas marked for removal. Keep one list of changes if the design gets revised.

Ask who will track comments and circulate the updated sheets. Take any earlier sketches out of the set the team uses to price the work so everyone refers to the same version.

Try thisPut the plan date and the last set of changes somewhere easy to find.

Follow the work from plans to construction

Find the reviewing agency.

Look up the parcel first. If it is in the City of Los Angeles, City Planning’s ZIMAS search is the starting point for property information.

Start here

For a property outside the City, confirm the appropriate city or county department and get its current submittal requirements.

Gather what the team needs to review.

Parcel and improvements

Record the property address or parcel number, visible structures, and available plans or surveys.

Initial design approach

Describe the proposed ADU type and which portions of the lot or structure would change.

Site conditions

Note access, slopes, changes to an existing building, and visible utilities. Ask the reviewing team which items need more documentation.

Agency and utility responsibilities

Confirm who prepares, submits, answers comments, and handles fees or appointments.

Using a standard plan?

The Los Angeles Department of Building and Safety program pre-approves standard designs. Staff still review the individual site.

When comparing plans, confirm the proposed entry, site access, window orientation, foundations, and utility routes on your own property.

See the City-owned YOU-ADU example

Compare layouts before committing

Check before you draw

Bring a short list of questions to the agency.

Give the reviewer the actual address, the type of ADU you’re considering, and what you know about the property. Ask which rules apply and what records or drawings the agency wants to see next.

Check how the existing property is recorded

Gather available plans and permit records, especially for a garage or addition that might be reused. Point out visible differences so the team can verify them.

Match the plan to the site

With a standard plan, ask what still needs site-specific review. Bring photos of access and likely service routes plus any useful survey or property dimensions.

Keep an agency decision log

Save the date, department and instruction received when you get an answer. Ask the design team how that answer changes the next submittal or investigation.

Using City resources

Record the questions that affect your address.

Prepare for the property walk

Identify the jurisdiction first.

For a property in the City, use Los Angeles City Planning’s zoning search. For other addresses, find the reviewing city or county. Save the parcel number if you can, plus any existing records useful to the planning conversation.

Separate the design from the site questions.

If you start with a City-listed plan, ask which site conditions still need review. Gather the information the reviewer or designer asks for about placement, services, access and foundations.

Record who owns each follow-up.

List the questions about records, plan scope, or separate utility work. Assign who will follow up and what supporting material they need. Keep the answers with the drawing revision and current proposal.

Keep a single record

Use one permit and drawing folder from day one.

Save the current drawing set and the latest set of reviewer comments together. On a separate page, keep a short record of open questions by trade or agency.

When a plan changes

Save the previous set in an archive and date the new one. Point out the sheets that change the proposal or the location of work.

When you have a question

Record the address, what you are proposing, the agency you asked, and what the team still needs to confirm. Bring that record to the next meeting.

Put the right information together

Separate what you know from what you need to ask.

Draft a short description you can use when you contact the reviewing office or your designer. Put the address next to the current and proposed uses.

  1. Collect the basics

    Keep the parcel lookup, old drawings or available permit records, and a photo of each structure in one place. Note anything on the lot you cannot match to an existing record.

  2. Write one clear question

    Ask about the issue affecting your choice first, such as who reviews the proposed work. Record the reply and the next step beside the document it refers to.

Let’s talk about what fits your lot.

A few photos and a clear goal give the first conversation a place to start.

Plan my ADU