Costs & Scope

Compare the work behind the price.

A useful ADU estimate tells you what the builder will do, what you will pay separately, and which items depend on conditions at your property.

ADU proposal · sample scope

What’s in the bid?

  • Design and engineering Included
  • Plan check and permit fees Owner pays
  • Sewer trench and connection Confirm route
  • Cabinets and countertops Allowance
  • Foundation and slab Confirm scope
Illustrative example for comparing proposals.

Ask for the full project scope.

Put the same drawings and finish assumptions in front of both builders. Then review where their responsibilities start and end.

Design and approvals

Confirm drawings, engineering, revisions, permit coordination, and fees.

Site and services

Identify access protection, excavation, utility lengths, and any known service changes.

Building and finishes

Review the proposed structure and materials, then identify finish allowances and what they cover.

Restoration and closeout

Check paving or yard restoration, cleanup, and who handles handoff.

One site, two proposals

How much work is included at the edge of the build?

Imagine the ADU sits beside an occupied home. Both proposals include building the new unit, but only one says how the shared route will be protected and left at the end.

White single-story structure with dark sliding windows and steps facing a patio
ADU4LESS concept · Glazed entrance and patio steps

Access and temporary protection

Ask whether the bid covers temporary protection for a side gate, windows, paving, and the path the crew will use. Confirm who moves or protects things before work starts.

Where new meets existing

Ask what the proposal includes where the new steps, paving, or finishes meet the old. Specify where a repair ends and what material or finish should match.

What would trigger a change

Ask which conditions the price assumes, who documents a change, and whether you will see the effect on cost and timing before you approve it.

Put two bids side by side.

Choose a status for each line while you review the written proposals. Use the differences to plan the next conversation.

ADU bid comparison

Six line items to review with each builder.

Scope itemBid ABid B
Drawings and engineeringPlans, consultants, and revisions
Permits and agency feesSubmission and who pays each charge
Site preparationAccess protection, demolition, and hauling
Utility connectionsTrenches, connections, and service changes
Interior finishesCabinet, floor, and fixture allowances
Restoration and closeoutPaving, yard repair, and walkthrough
6 scope items need clarification.

Illustrative budget

From a $205,000 bid to a $285,000 project.

Here’s how a homeowner can turn one construction proposal into a working total. These sample amounts demonstrate the math. Pricing depends on the actual property and written proposal.

The question to ask: Does your bid include the utility run and the driveway patch? If it does, count that work only once.

Design and agency costsDrawings, engineering and agency fees carried separately.
$28,000
Construction proposalThe builder’s written construction scope in this example.
$205,000
Separate site and utility workA utility run and driveway patch excluded from this example’s proposal.
$24,000
Owner purchasesAppliances and selected fixtures the owner buys separately.
$8,000
Reserve for open itemsMoney the owner sets aside for unresolved conditions.
$20,000
Working project total
$285,000

Build your own budget

What does the whole project add up to?

Use your numbers to estimate the total. Enter each cost once and leave uncertain items blank until someone can price them.

If excavation and utility connections are inside the construction proposal, keep them there. If they are outside it, put them under separate site work. That one check keeps an estimate useful.

Include agency fees you expect to pay separately.

Use the written proposal total.

Add only work outside the proposal.

Add appliances, fixtures or finishes you will buy directly.

Use an amount you are comfortable setting aside.

Working total

Enter your amounts

Uses your inputs only. This worksheet is for planning and stays in your browser.

Bring the open questions to your builder.

Flag any missing utility, restoration, or allowance details. Bring the items that could affect the total to your first conversation.

Reading a finish allowance

Turn a finish sample into a written scope.

A finish sample can help everyone discuss the look. Your proposal should say what the builder is pricing, what you will select, and which items you may purchase separately.

Open room with a sofa, kitchen, and chairs near glazed doors
ADU4LESS concept · Kitchen and living space in a compact plan

Cabinets and counters

Ask which cabinet runs, storage fittings, hardware and installation are covered. Confirm countertop material, fabrication, sink cutouts, backsplashes and which items affect the allowance.

Fixtures and appliances

List the sink, faucet, lighting and appliances. For each, identify who supplies it, who installs it, and what the proposal allows for delivery and connections.

Confirm the price before you order

Ask for changes in writing. Compare the new total with the allowance and check whether a different selection changes utility locations, delivery timing, or related work.

Example

Same words, different work.

Two bids say “sewer connection.” One builder quotes pipe and trenching to an existing connection. The other also describes concrete removal and a new driveway patch.

Put this question in writing

Where does the quoted route start and end? Which surfaces are removed, hauled away, and restored? What happens if the connection point changes once we check the property?

Get answers before you sign.

How does a finish allowance work?

Ask for the amount, which materials and labor it covers, and who pays or receives the difference after selections.

Can I estimate from the square footage?

Use size as a starting point. Check site access, grading, services, finishes, and design and approval costs before comparing totals.

Who handles a change in the field?

Ask who proposes the change, how it affects the amount and schedule, and how approval is documented before proceeding.

What the proposal needs to say

Read “turnkey” one line at a time.

Make every major line answer three questions. Who supplies it? Who installs or coordinates it? Where does the work end? Compare the details before comparing the final totals.

Electrical and lighting

Separate rough wiring from fixtures, outlets, switches and final installation. If the panel or service may need changes, ask what finding would trigger that additional work.

Heating, cooling and plumbing

Ask whether equipment, controls, startup, fixtures and final connections are included. Record which items the builder supplies and what the owner chooses or purchases.

Appliances, finishes and cleanup

List appliances separately from cabinet and fixture allowances. Check who supplies countertops, shower glass, hardware and final cleanup, including debris outside the immediate work area.

Read the proposal

Distinguish a firm price, an allowance, and an open item.

Check the work outside the footprint

A firm price still needs boundaries.

Find where the work begins and ends, which drawings and finishes it assumes, and what happens if those assumptions change. “Electrical” on its own does not tell you how fixtures, switches, equipment or service changes are treated.

An allowance needs a basis.

Ask whether the amount is for materials alone or includes delivery, tax and installation where applicable. Confirm how you select the item, how any difference is calculated, and where the approval is recorded.

An unknown needs a plan to resolve it.

If a service route is uncertain, identify who checks it, when it can be checked, and how a revised scope will be documented. List owner purchases and charges by outside parties so you can compare the full project.

A line worth checking twice

Compare what happens when a finish changes.

Imagine switching from the proposed countertop to a different material. Ask which costs change before requesting a new total.

What is in the original price?
Write down the material allowance, fabrication details, and what is included for delivery and installation. Ask both bidders to separate these in the same way.
What changes with the selection?
Check whether there are new cutouts, edge details, lead times, or other work. Ask the builder to show the price and schedule effects together.

Let’s talk about what fits your lot.

A few photos and a clear goal give the first conversation a place to start.

Plan my ADU