Access and temporary protection
Ask whether the bid covers temporary protection for a side gate, windows, paving, and the path the crew will use. Confirm who moves or protects things before work starts.
Costs & Scope
A useful ADU estimate tells you what the builder will do, what you will pay separately, and which items depend on conditions at your property.
ADU proposal · sample scope
Put the same drawings and finish assumptions in front of both builders. Then review where their responsibilities start and end.
Confirm drawings, engineering, revisions, permit coordination, and fees.
Identify access protection, excavation, utility lengths, and any known service changes.
Review the proposed structure and materials, then identify finish allowances and what they cover.
Check paving or yard restoration, cleanup, and who handles handoff.
One site, two proposals
Imagine the ADU sits beside an occupied home. Both proposals include building the new unit, but only one says how the shared route will be protected and left at the end.

Ask whether the bid covers temporary protection for a side gate, windows, paving, and the path the crew will use. Confirm who moves or protects things before work starts.
Ask what the proposal includes where the new steps, paving, or finishes meet the old. Specify where a repair ends and what material or finish should match.
Ask which conditions the price assumes, who documents a change, and whether you will see the effect on cost and timing before you approve it.
Choose a status for each line while you review the written proposals. Use the differences to plan the next conversation.
Illustrative budget
Here’s how a homeowner can turn one construction proposal into a working total. These sample amounts demonstrate the math. Pricing depends on the actual property and written proposal.
The question to ask: Does your bid include the utility run and the driveway patch? If it does, count that work only once.
Build your own budget
Use your numbers to estimate the total. Enter each cost once and leave uncertain items blank until someone can price them.
If excavation and utility connections are inside the construction proposal, keep them there. If they are outside it, put them under separate site work. That one check keeps an estimate useful.
Flag any missing utility, restoration, or allowance details. Bring the items that could affect the total to your first conversation.
Reading a finish allowance
A finish sample can help everyone discuss the look. Your proposal should say what the builder is pricing, what you will select, and which items you may purchase separately.

Ask which cabinet runs, storage fittings, hardware and installation are covered. Confirm countertop material, fabrication, sink cutouts, backsplashes and which items affect the allowance.
List the sink, faucet, lighting and appliances. For each, identify who supplies it, who installs it, and what the proposal allows for delivery and connections.
Ask for changes in writing. Compare the new total with the allowance and check whether a different selection changes utility locations, delivery timing, or related work.
Example
Two bids say “sewer connection.” One builder quotes pipe and trenching to an existing connection. The other also describes concrete removal and a new driveway patch.
Where does the quoted route start and end? Which surfaces are removed, hauled away, and restored? What happens if the connection point changes once we check the property?
Ask for the amount, which materials and labor it covers, and who pays or receives the difference after selections.
Use size as a starting point. Check site access, grading, services, finishes, and design and approval costs before comparing totals.
Ask who proposes the change, how it affects the amount and schedule, and how approval is documented before proceeding.
What the proposal needs to say
Make every major line answer three questions. Who supplies it? Who installs or coordinates it? Where does the work end? Compare the details before comparing the final totals.
Separate rough wiring from fixtures, outlets, switches and final installation. If the panel or service may need changes, ask what finding would trigger that additional work.
Ask whether equipment, controls, startup, fixtures and final connections are included. Record which items the builder supplies and what the owner chooses or purchases.
List appliances separately from cabinet and fixture allowances. Check who supplies countertops, shower glass, hardware and final cleanup, including debris outside the immediate work area.
Read the proposal
Find where the work begins and ends, which drawings and finishes it assumes, and what happens if those assumptions change. “Electrical” on its own does not tell you how fixtures, switches, equipment or service changes are treated.
Ask whether the amount is for materials alone or includes delivery, tax and installation where applicable. Confirm how you select the item, how any difference is calculated, and where the approval is recorded.
If a service route is uncertain, identify who checks it, when it can be checked, and how a revised scope will be documented. List owner purchases and charges by outside parties so you can compare the full project.
A line worth checking twice
Imagine switching from the proposed countertop to a different material. Ask which costs change before requesting a new total.
A few photos and a clear goal give the first conversation a place to start.