Utilities & Site Work

Follow the utilities all the way to the house.

A site has to carry more than the new home. Look at service routes, delivery access, and what happens to the driveway and yard during construction.

Small home with rooftop solar panels and outdoor equipment beside the front steps
ADU4LESS concept · Outdoor equipment beside the entry

Two similar floor plans can need very different site work. Ask where each route runs and which parts of the property it affects.

Record what you can see

Take photos of the electrical service equipment, meters, and visible access points from a safe location. Collect any site drawings or previous utility work records you have. Mark where the proposed ADU might sit relative to those points.

Ask which locations are known and which need investigation. A route on a sketch helps a team compare options. Confirm actual connection points and any required agency or utility involvement before making assumptions about the work.

Compare routes with surfaces included

Draw each possible route over a simple picture of the property. Mark paving, walls, trees, irrigation, fences and any areas both households need to access. Ask how the household uses the site while work is underway.

Discuss where removal begins and where restoration ends. A scope that describes the pipe or conduit alone may leave the trench, hauling, or surface repairs unclear. Ask who checks the route and how a change gets documented if conditions differ.

Confirm coordination and future access

Ask who arranges utility appointments and who is responsible for service changes. Confirm whether charges are inside the proposal or paid to another party and what approval or inspection milestones affect the schedule.

Before settling the layout, check where the homeowner or service provider can reach equipment, panels and shutoffs. Discuss how the decision affects outdoor seating, entries, storage and future maintenance.

Planning example

One trench, two possible routes

The short route crosses the owner’s driveway. A longer route runs beside planting and may avoid a major patch. Both depend on whether a connection is available where assumed. The homeowner asks the builder to price both scoped options after the connection is verified.

Checklist

Common questions

Should I expect separate meters?

Discuss your intended use with the builder and the applicable utilities. Ask which arrangements the provider offers for your address and who pays for the chosen scope.

Who restores the driveway after a trench?

Check the proposal. It should identify the surfaces to be restored, what kind of repair is included, and who is responsible if the route changes.

Drawing a route

Show what each service crosses on the way in.

On a copy of the site sketch, mark what you can see and add a question mark where a route is still unknown. Mark any patio, driveway, planting, or gate that may be affected.

Review how someone will reach the service points after the ADU is occupied. A shorter route can still create more disruption if it crosses a surface you want to keep.

Try thisAsk who confirms each connection and whether restoring the path or driveway is included.

Review site work in the estimate

After the connection is made

Leave the equipment a way out.

Ask how equipment could be inspected or replaced a few years from now. A sensible utility route for the build still needs useful service access after move-in.

Mark it on the sketch

Show the main equipment, shutoffs, gates, and places where a worker or replacement appliance needs room to turn.

Protect the everyday route

Compare equipment placement with the route people take to the entry and seats outside. Ask where service access and ordinary use can stay separate.

Follow the route all the way

Include the surface you need back at the end.

Draw a rough service path to the ADU, then walk that route on the property. Mark the surfaces and features likely to be affected.

  1. Before the work starts

    Note fencing, paving, planting, or shared access along the route. Ask which connections and measurements still need confirmation.

  2. After the work is done

    Describe what you want restored and how people will get to equipment for service. Ask the builder to include both in the written scope.