Mark it on the sketch
Show the main equipment, shutoffs, gates, and places where a worker or replacement appliance needs room to turn.
Utilities & Site Work
A site has to carry more than the new home. Look at service routes, delivery access, and what happens to the driveway and yard during construction.

Two similar floor plans can need very different site work. Ask where each route runs and which parts of the property it affects.
Take photos of the electrical service equipment, meters, and visible access points from a safe location. Collect any site drawings or previous utility work records you have. Mark where the proposed ADU might sit relative to those points.
Ask which locations are known and which need investigation. A route on a sketch helps a team compare options. Confirm actual connection points and any required agency or utility involvement before making assumptions about the work.
Draw each possible route over a simple picture of the property. Mark paving, walls, trees, irrigation, fences and any areas both households need to access. Ask how the household uses the site while work is underway.
Discuss where removal begins and where restoration ends. A scope that describes the pipe or conduit alone may leave the trench, hauling, or surface repairs unclear. Ask who checks the route and how a change gets documented if conditions differ.
Ask who arranges utility appointments and who is responsible for service changes. Confirm whether charges are inside the proposal or paid to another party and what approval or inspection milestones affect the schedule.
Before settling the layout, check where the homeowner or service provider can reach equipment, panels and shutoffs. Discuss how the decision affects outdoor seating, entries, storage and future maintenance.
Planning example
The short route crosses the owner’s driveway. A longer route runs beside planting and may avoid a major patch. Both depend on whether a connection is available where assumed. The homeowner asks the builder to price both scoped options after the connection is verified.
Discuss your intended use with the builder and the applicable utilities. Ask which arrangements the provider offers for your address and who pays for the chosen scope.
Check the proposal. It should identify the surfaces to be restored, what kind of repair is included, and who is responsible if the route changes.
Drawing a route
On a copy of the site sketch, mark what you can see and add a question mark where a route is still unknown. Mark any patio, driveway, planting, or gate that may be affected.
Review how someone will reach the service points after the ADU is occupied. A shorter route can still create more disruption if it crosses a surface you want to keep.
Try thisAsk who confirms each connection and whether restoring the path or driveway is included.
Review site work in the estimateAfter the connection is made
Ask how equipment could be inspected or replaced a few years from now. A sensible utility route for the build still needs useful service access after move-in.
Show the main equipment, shutoffs, gates, and places where a worker or replacement appliance needs room to turn.
Compare equipment placement with the route people take to the entry and seats outside. Ask where service access and ordinary use can stay separate.
Follow the route all the way
Draw a rough service path to the ADU, then walk that route on the property. Mark the surfaces and features likely to be affected.
Note fencing, paving, planting, or shared access along the route. Ask which connections and measurements still need confirmation.
Describe what you want restored and how people will get to equipment for service. Ask the builder to include both in the written scope.
A few photos and a clear goal give the first conversation a place to start.