Our Process

From the first walk to the keys.

See what happens at each stage, the decisions you’ll make, and what you can ask the builder to show you before work moves forward.

Residential structure with exposed sheathing and openings for windows and doors
Supplied reference · Exterior sheathing and openings during construction

A schedule shaped by decisions.

Ask for clear milestones, a current plan set, and a record of decisions that can change scope or timing.

Timber-framed small building with a roof and openings for windows and doors
ADU4LESS concept · Roof and window openings at framing
  1. First property walk

    Discuss who the ADU is for. Walk the route from the street, look at the likely footprint, and list the items the team needs to verify.

    What to review Bring a rough sketch or a few photos and describe what you want to keep.

  2. Feasibility and layout

    Review options for the footprint, access, privacy, and utility routes. Discuss the information needed to develop the scope.

    What to review Review both the preferred layout and a fallback if a site condition changes the plan.

  3. Drawings, proposal, and submission

    Confirm which drawings and consultants are included and who handles submission, agency responses, and fees.

    What to review Keep the current drawing set and proposal together. Track open questions and who owns each one.

  4. Preparation and construction

    Confirm access, staging, deliveries, early selections, and planned interruptions. Agree on how work changes are proposed and approved.

    What to review Work through decisions before they delay orders or materials. Keep approvals in writing.

  5. Inspection and handoff

    Walk the property with the team, review how equipment works, and document remaining items and who will handle them.

    What to review Collect equipment manuals and any project records you want available after move-in.

Before walls close

Make the decisions the next crew is waiting on.

Framing is when the rooms and openings become easy to see. It’s also a good point to check decisions that affect windows, cabinets, equipment, and the work behind the walls.

Gable-roof frame with the front wall openings exposed
ADU4LESS concept · Front openings during a framing study

Walk the framed rooms with the current plan

Confirm the intended direction of doors and windows. Check with the builder which openings are already tied to orders and which decisions can still be reviewed.

Write down what another trade needs

A cabinet or appliance change may affect wiring, plumbing, or ventilation. Ask who will review that change and how it affects the work and schedule before anyone proceeds.

Know what gets reviewed next

Ask which inspections or checks are scheduled before work is covered. Record any open item, who will resolve it, and when the next crew can start.

Four handoffs to watch

See what gets decided before work moves ahead.

Use these check-ins to know what to ask for, which decisions are still open, and which ones affect the next trade.

Cutaway concept showing a small home, exposed roof framing, and furnished rooms
ADU4LESS concept · Illustrative cutaway of the roof and rooms

Before drawings advance

Review the entry, main sightlines, and what stays in the yard. Ask the designer to mark any assumptions about access and equipment.

Before the site opens

Agree on crew access, storage, any interruptions for the household, and what happens to paths and landscaping when the build wraps.

Before walls close

Use the current drawings to review doors, cabinets and equipment locations with the builder. Record who handles each outstanding decision.

At handoff

Walk ordinary routines with the builder. Try doors and equipment, review owner materials, and agree how remaining work will be tracked.

Have a proposal or drawings?

Check who handles approvals, utility work, and site restoration while you can still compare those responsibilities in writing.

Living through the work

Protect a routine that still works.

Access and deliveries

Decide where the crew enters, where deliveries land, and how households access the house during work.

Utilities and interruptions

Ask who gives notice and how much preparation the household needs for planned service interruptions.

Finishes and decisions

Agree when cabinets, fixtures, and surfaces need to be selected, particularly when an item affects rough-in or ordering.

Make handoff practical.

Walk the site with a list. Try the equipment, look at repairs to existing surfaces, and assign open items with a date for follow-up.

Keep the project record together.

  • Current plans and approved changes
  • Inspection and closeout records available for the project
  • Equipment information and applicable warranty contacts

See the City and state permit resources

Timing and decisions

The weeks before construction matter.

Discuss the schedule in three parts. Design and agency review, preparation and ordering, and work on site each depend on different people and decisions. Ask who keeps each stage moving.

Confirm decisions tied to ordering

Ask when exterior doors, windows, cabinets and equipment need to be ordered. Tie each choice to a milestone and identify who needs to approve it.

Know what an inspection changes

Ask which work has to be reviewed before it gets covered, who schedules each visit, and how corrections or rescheduling affect the work that follows.

Plan for the original household

Keep residents informed about deliveries, blocked access, dust protection and planned utility interruptions. Identify a contact and an agreed place for weekly updates and written decisions.

From design to move-in

Know which decisions unlock the next stage.

Follow the construction milestones

Before submitting.

Review the same drawing set together. Ask where the plans depend on a site measurement or an agency answer. Write down who needs to verify it and how that might change the proposal.

Before ordering.

Match windows, doors, appliances and equipment to the current drawings. Review selection deadlines, finish and size, and delivery assumptions. Ask who can approve a substitute if an item’s availability changes.

Before move-in.

Walk the work with the builder and ask for equipment demonstrations. Record remaining items, ownership, and follow-up dates. Collect available records and find out where to go with a maintenance or warranty question.

A walkthrough before finishes

See what the openings reveal.

Once rooms are framed, the entries and windows start to make sense at their actual size. Use that stage to walk through decisions with the project team.

Framing study with a group standing beside an upright timber wall
ADU4LESS concept · An exterior wall and openings during framing
  1. Walk the route

    Start at the front door and go to the bath and kitchen. Ask which openings are final and where a drawing still needs clarification.

  2. Record the decision

    Note the room, drawing date, who will confirm the answer, and which order or task might wait for it. Keep one record the team can refer back to.