Walk the framed rooms with the current plan
Confirm the intended direction of doors and windows. Check with the builder which openings are already tied to orders and which decisions can still be reviewed.
Our Process
See what happens at each stage, the decisions you’ll make, and what you can ask the builder to show you before work moves forward.

Ask for clear milestones, a current plan set, and a record of decisions that can change scope or timing.

Discuss who the ADU is for. Walk the route from the street, look at the likely footprint, and list the items the team needs to verify.
What to review Bring a rough sketch or a few photos and describe what you want to keep.
Review options for the footprint, access, privacy, and utility routes. Discuss the information needed to develop the scope.
What to review Review both the preferred layout and a fallback if a site condition changes the plan.
Confirm which drawings and consultants are included and who handles submission, agency responses, and fees.
What to review Keep the current drawing set and proposal together. Track open questions and who owns each one.
Confirm access, staging, deliveries, early selections, and planned interruptions. Agree on how work changes are proposed and approved.
What to review Work through decisions before they delay orders or materials. Keep approvals in writing.
Walk the property with the team, review how equipment works, and document remaining items and who will handle them.
What to review Collect equipment manuals and any project records you want available after move-in.
Before walls close
Framing is when the rooms and openings become easy to see. It’s also a good point to check decisions that affect windows, cabinets, equipment, and the work behind the walls.

Confirm the intended direction of doors and windows. Check with the builder which openings are already tied to orders and which decisions can still be reviewed.
A cabinet or appliance change may affect wiring, plumbing, or ventilation. Ask who will review that change and how it affects the work and schedule before anyone proceeds.
Ask which inspections or checks are scheduled before work is covered. Record any open item, who will resolve it, and when the next crew can start.
Four handoffs to watch
Use these check-ins to know what to ask for, which decisions are still open, and which ones affect the next trade.

Review the entry, main sightlines, and what stays in the yard. Ask the designer to mark any assumptions about access and equipment.
Agree on crew access, storage, any interruptions for the household, and what happens to paths and landscaping when the build wraps.
Use the current drawings to review doors, cabinets and equipment locations with the builder. Record who handles each outstanding decision.
Walk ordinary routines with the builder. Try doors and equipment, review owner materials, and agree how remaining work will be tracked.
Check who handles approvals, utility work, and site restoration while you can still compare those responsibilities in writing.
Living through the work
Decide where the crew enters, where deliveries land, and how households access the house during work.
Ask who gives notice and how much preparation the household needs for planned service interruptions.
Agree when cabinets, fixtures, and surfaces need to be selected, particularly when an item affects rough-in or ordering.
Walk the site with a list. Try the equipment, look at repairs to existing surfaces, and assign open items with a date for follow-up.
Timing and decisions
Discuss the schedule in three parts. Design and agency review, preparation and ordering, and work on site each depend on different people and decisions. Ask who keeps each stage moving.
Ask when exterior doors, windows, cabinets and equipment need to be ordered. Tie each choice to a milestone and identify who needs to approve it.
Ask which work has to be reviewed before it gets covered, who schedules each visit, and how corrections or rescheduling affect the work that follows.
Keep residents informed about deliveries, blocked access, dust protection and planned utility interruptions. Identify a contact and an agreed place for weekly updates and written decisions.
From design to move-in
Review the same drawing set together. Ask where the plans depend on a site measurement or an agency answer. Write down who needs to verify it and how that might change the proposal.
Match windows, doors, appliances and equipment to the current drawings. Review selection deadlines, finish and size, and delivery assumptions. Ask who can approve a substitute if an item’s availability changes.
Walk the work with the builder and ask for equipment demonstrations. Record remaining items, ownership, and follow-up dates. Collect available records and find out where to go with a maintenance or warranty question.
A walkthrough before finishes
Once rooms are framed, the entries and windows start to make sense at their actual size. Use that stage to walk through decisions with the project team.

Start at the front door and go to the bath and kitchen. Ask which openings are final and where a drawing still needs clarification.
Note the room, drawing date, who will confirm the answer, and which order or task might wait for it. Keep one record the team can refer back to.
A few photos and a clear goal give the first conversation a place to start.