Construction Milestones

Know what happens on site, and when.

A construction timeline is easier to follow when it shows what needs to happen before each stage can move. Use this guide to prepare for deliveries, decisions, inspections and handoff.

A worker fitting a window in an unfinished timber wall
ADU4LESS concept · Window placement in an unfinished wall

Ask for the work sequence, who owns the next decision, and what the household needs to prepare.

Before the crew arrives

Review how crews, materials, and debris will move through the property. Agree where temporary fencing, protection, and deliveries can go. Note any hours or gates the household needs to coordinate. Give residents a useful way to hear about access changes and interruptions.

Ask what site information still needs verification before work starts. Check which window, door, cabinet, fixture, and equipment choices affect orders or work that begins before finishes arrive.

What happens before walls close

After site preparation and foundation work, framing sets the locations of rooms and openings. Plumbing, electrical, ventilation and equipment rough-ins use those locations. If a fixture or opening changes at this point, ask which other trades or orders it affects.

Review inspection milestones with the builder. Agree who schedules each review, who handles any corrections, and which work depends on it. Ask for enough time to answer design questions before a crew needs the decision in the field.

Open timber wall and roof framing with shadows on a concrete slab
ADU4LESS concept · Open roof and wall framing

How to turn handoff into a useful walkthrough

Test the things you will use on the first day. Try doors, windows, appliances and controls. Ask to see shutoffs and filters, how to clean any specialty finish, and where to find equipment records.

Create a list of any remaining items, each with its owner and expected follow-up date. Keep current drawings, changes, selections, and project records in one place so the next service visit starts with the right information.

Planning example

A window choice affects multiple trades

The owner wants a different kitchen window after reviewing the counter elevation. The builder checks the rough opening, lead time, finish work and location of nearby outlets before pricing the change. That gives the homeowner a clear decision and shows what may need to move in the schedule.

Checklist

Common questions

Why can a finish choice matter long before installation?

The choice may affect dimensions, wiring, plumbing, or an order that must arrive at the right point in the work. Ask when the builder needs the decision.

How do I know whether a milestone is complete?

Ask for the scope of the milestone, any required review or inspection, and which open items must be addressed before the next stage.

Documenting progress

Photograph the work from the same doorway.

Ask the builder for a safe time to take a wide view of each room. Repeat it before the walls are closed and at the final walkthrough. The pictures give you a quick way to remember what changed and where equipment landed.

Keep the date and room label with every image. Keep approval records and written changes in the project file alongside the photos.

Try thisStart with the kitchen wall, the laundry area, and the place where the new work meets the house.

See the full construction sequence

A log you can actually use

Record decisions the next crew needs to know.

Keep a simple log with date, room, decision, and next action. Pair it with one photo showing the room and another showing the issue up close.

Before something is covered

Ask the builder what is ready for review and which work must stay visible. Note pending checks and who will report when they are resolved.

When a selection changes

Record what changed and confirm whether the update affects other trades. Keep the agreed price and schedule changes alongside the plan revision.

A useful project record

Take three photos that explain the same decision.

One clear sequence will often help more than a folder full of close-ups. Use the current plan to record what a photo shows.

  1. Start wide

    Take a view that identifies the room or wall, then a second showing how the item sits beside an opening or connection.

  2. Finish with a detail

    Take the detail photo from a safe location, add the date and what still needs confirmation, and store it with the relevant drawing or meeting note.